100kW Synergy Manager SWITCH DC Switch, MC4, DC SPD

£4,109.36

Categories: ,
100kW Synergy Manager SWITCH DC Switch, MC4, DC SPD
Part No: SE-100000-SWITCH-FULL
Inverters – Main Units
  • Rating: 100,000W
  • Phases: 3
This part is made up of the following items:
3 x
SE-SYNERGY-RSD
Synergy Secondary Unit with RapidShutdownDevice  
1 x
SE-100000-MNGR-S
100kW Synergy Manager SWITCH with DC Switch, MC4, DC SPD  

Three Phase Synergy Inverter

Main features:

  • Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
  • Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
  • Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
  • Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
  • Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
  • Built-in PID mitigation for maximized system performance.
  • Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
  • Integrated DC safety switch eliminates the need for external DC isolators.
Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
 
Some documents are currently missing. These will be added as soon as available.