- 66.6kW Synergy Manager BASE No DC Switch, MC4, DC SPD
- Part No: SE-66600-BASE-FULL
- Inverters – Main Units
- Rating: 66,600W
- Phases: 3
- Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
- Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
- Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
- Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
- Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
- Built-in PID mitigation for maximized system performance.
- Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
This part is made up of the following items:
2 x SE-SYNERGY-RSD |
Synergy Secondary Unit with RapidShutdownDevice | |
1 x SE-66600-MNGR-B |
66.6kW Synergy Manager BASE No DC Switch, MC4, DC SPD |
Three Phase Synergy Inverter
Main features:
Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
Some documents are currently missing. These will be added as soon as available.